End-of-Day Brief · ATLAS

Friday, June 26, 2026 · generated 6:00 PM ET by Atlas · source todos.json
✓ Trading day closed · Sprint 1 final day · retrospective for Monday's standup + Sprint 2 kickoff (Mon 6/29 8:30 AM ET)
2
shipped today
6
in flight
4
new blockers open
36
open P0
0/8
Sprint 1 done

Shipped today completed_at = 2026-06-26 ET, grouped by project

In flight today status = in_progress · note-edit time = unknown (no git history on todos.json)

Also opened today (pending, 7): PinePB J3P — live smoke test: TV alert -> webhook -> indicato  PinePB J3P — FashLate-style label/alert polish (compact toggl  PinePB J3P v2.3 — rebuild Trend play as Dale VWAP 1st-deviati  SIP Deploy J3P across SIP master_watchlist (TV layout + we  SIP Auto-sync /sip/watchlist.json -> TradingView symbol li  Exec Backtest J3P plays (Focus-3/KITE) on SIP names — edge  Exec Wire setups.today.json -> hotkey-engine for J3P-graded

New blockers raised today created_at = 2026-06-26 · P0/P1

6 P0/P1 tickets created today — all spun out of today's SIP/PinePB indicators + g8trade kickoff. 2 shipped same-day, leaving 4 open. None are external/human blockers — every one is owner: claude follow-on build work, not something waiting on the team.
AgeProjectOwnerPriTitle
0dPinePBclaudeP1J3P — live smoke test: TV alert -> webhook -> indicator_alerts row (1 SIP name)
0dSIPclaudeP1Deploy J3P across SIP master_watchlist (TV layout + webhook alert per symbol)
0dExecclaudeP1Backtest J3P plays (Focus-3/KITE) on SIP names — edge by playbook x grade x tier before hotkeys
0dExecclaudeP1Wire setups.today.json -> hotkey-engine for J3P-graded entries (SIM -> forward-test)

What's open for tomorrow ranked for Mon 6/29 standup · aligned to the carried-over Sprint 1 goal

1
Run scientific_layer migrations 001-009 via psql tunnel
Critical-path unblock · owner: user · P0 · 65d blocked. Retires the daily_summary view, the rule-based classifier path, and identity_fn DB writes. Unchanged all of Sprint 1 - still the single highest-leverage step, and it carries straight into Sprint 2 (“Classifier production + AMS Phase 1 sign-off”). Nothing downstream moves until it lands.
2
Seed AMS main.users + resolve the 7 open decisions (D1-D7)
Both owner: user, P0, and both rolled over from Sprint 1's goal “Seed AMS users so onboarding stops being painful.” Seeding main.users is what makes identity_fn return a non-zero user; D1-D7 unblocks the rest of the AMS Phase-1 build that Sprint 2 signs off on.
3
Fix the two Acct-v2 date-range bugs (Risk Bump bar + Ticket Meter denominator)
Sprint 1 goal #3, both owner: jimbo, P0, both visibly wrong on every non-5-day range. The HUD is off-limits to Claude - these need Jimbo at the keyboard, so surface them at Monday's standup.

Critical path · next unblockable step from /system/sprint-plan.html

1
USER: run scientific_layer migrations 001–009 via psql tunnel P0
65d blocked · owner: user. Retires four user P0s and unblocks p0-daily-summary-view, the rule-based classifier path, and identity_fn DB writes. No movement today — the next-unblockable item is unchanged from this morning and from the start of Sprint 1, and everything downstream still waits on it.

Sprint progress Sprint 1 · 2026-06-22 → 2026-06-26 ET · final day

0 tickets done / 8 total in Sprint 1 · 0% complete · day 5 of 5 (final day)
Sprint 1 closes today at 0/8. All 8 tickets carry into Sprint 2 (6/29 → 7/3, “Classifier production + AMS Phase 1 sign-off”). The day went to net-new build (J3P indicators + the SIP→g8trade kickoff) rather than burning down the foundation backlog — the velocity is real but it landed outside the sprint scope.
Goal: Close Phase 0 gaps. Seed AMS users so onboarding stops being painful. Fix Acct-v2 date-range bugs.